lhsbanner buildregisters oran

lhsbanner csbtk blue

lhsbanner fmb2

News

Budget boost for housing

Chancellor gives housing £44bn commitment in the latest budget

Read more

Virgin Money supports custom build

 Virgin Money is the latest big name to show support for the self ....

Read more

Task Force Announcements

A trio of announcemens, including a new Director for NaCSBA's expert Task Force 

Read more

New Registers to Facilitate Residential Land Supply

Can redeveloping more browfield land help to solve the housing crisis? 

Read more

Self-Build as Housing Market Fix

Capacity in the Homebuilding Industry: How the UK is falling short with self-building 

Read more

Case Studies

Contemporary Timber Frame Home

Read more

Passivhaus Family Farmhouse

Read more

Steel Farm

Read more

Merlin Haven

Read more

Timber Frame Home, Ventnor

Read more

Aldcliffe Yard, Lancaster

Read more

Walthamstow Social Rent Scheme

Read more

Prefabricated Passivhaus bungalow

Read more

Cookham Dean, Berkshire

Read more

Harvest House

Read more

Bickleigh Eco Village, Devon

Read more

Stoke-on-Trent Serviced Building Plots

Read more

Forevergreen House

Read more

Housing People Building Communities

Read more

Sülzer Freunde, Cologne

Read more

Berlin - 'Building Groups'

Read more

Manor Farm, Kirton

Read more

Straw-baling, Perthshire

Read more

Findhorn

Read more

Almere, Holland

Read more

Hockerton

Read more

Top tips

Heating

Heating Read more

we support_logo-2tb

Prefabricated Passivhaus bungalow

Background:

  • This home was built for a retired couple in Inverness, Scotland by German-based premanufacturer Hanse Haus.
  • It's a certified-Passivhaus bungalow which boasts an airtight building envelope and incredibly high levels of thermal insulation as well as a state-of-the-art Mechanical Ventilation Heat Recovery (MVHR) system, allowing 94.4% of heat within the property to be recycled.
  • The property is north-facing but boasts an innovative roof design so that south-facing windows allow light and heat to penetrate into north-facing rooms.

Delivery:

  • The bungalow includes three bedrooms, an open plan kitchen/dining room and living room.
  • The build system combines timber structural insulated panels (SIPs) with solid wall construction.
  • It sits on 0.25 acres and the land was bought as a serviced plot that forms part of an estate of 24 individual self build homes.
  • The design brief from the local authority included a number of restrictions for the build, including the colour of the render, and the need for cornerstones, grey roof tiles and black uPVC downpipes.
  • Due to it being a Passivhaus-certified build, detailed planning permission was granted in just seven days. However the Passivhaus Institute spent more than three months undertaking complex calculations to confirm that the proposed building could be made to reach their standards; this meant that it would become the first Passivhaus-certified prefabricated bungalow in the world.
  • To reach Passivhaus requirements, 320mm of load-bearing insulation was installed on top of the completed foundations, and the groundworkers then laid the 184m2 reinforced concrete slab to a 5mm tolerance, ready to build on.
  • Over in Germany, the factory had manufactured the precision-engineered hybrid SIPs wall panels, with windows, additional insulation, doors and window sills added step by step. Ceiling and roof elements are built with the outside membrane already installed, which means that the structure can be made weatherproof in just two or three days.
  • The whole house is test-assembled in the factory, then disassembled and all the components delivered to the UK.
  • The ultra low-energy bungalow boasts high levels of insulation, LED and low-wattage lighting and an MVHR system.
  • Triple-glazed windows ensure that the inner pane remains at room temperature to prevent condensation, and a sturdy insulated external door is clamped shut by turning the key three times, which creates an air-lock vestibule to prevent heat loss. The annual heating bills are estimated as low as £140, despite the fact that the site is north-facing.
  • A 4m2 array of solar thermal panels has been mounted on the south-facing section of metal roof. This is connected to a 300 litre heat exchange/storage tank, a Vaillant EcoTEC boiler and a solar pump to boost hot water for underfloor heating in bathrooms and reception rooms. Automated external solar blinds have been installed to the main south-facing windows in order to prevent overheating; they are operated by a radio-controlled weather station, which can be overridden by a hand-held transmitter.
  • Such is the quality and air tightness of the bungalow that it achieved an impressive 0.23 air changes per hour when tested (the Passivhaus requirement is below 0.6).
  • The living room and kitchen/dining room are located on the north side of the building so the couple enjoy far-reaching views from their elevated site. In order to counteract the lack of south-facing glazing in these rooms the bungalow was designed as two distinct blocks, with a split-level roof, which enabled large clerestory windows to be introduced at a height of five metres.
  • From the front, the property appears to be a modest low-slung bungalow, with a traditional slate-covered roof that creates high sloping ceilings inside.
  • The rear of the building is altogether more contemporary, however, with bedrooms and bathrooms contained in a lower section, roofed in metal, which enables sunlight to reach the clerestory windows above.

Finance:

  • The plot cost £125,000.
  • The build cost was £435,000.
  • The total cost-per-m2 is £3,043; based on the gross floor area of 184m2.

Timescale:

  • Building work commenced in June 2012.
  • The bungalow was weatherproof in just two days.
  • It was completed to turnkey in just 12 weeks.
  • The entire project including the installation of all services was completed in 25 weeks.

Learning Points:

  • Off-site construction might be a good option to choose if you'd like to build your own home quickly and with minimal disruption onsite. The panels are assembled in warm/dry factory conditions and, once moved to plot, the homes are typically water and weatherproof within two to three days. Turnkey completion can typically be achieved in as little as eight weeks.
  • Building a Passivhaus-certified home doesn't necessarily mean that planning permission will be gained quicker. However, various planning authorities now require homes to be built to a certain level of Code for Sustainable Homes (CSH).
  • Its worth setting money aside in case your plot requires extensive remedial work. Site excavations for this home uncovered an unexpected seam of unsupported ground running across the hillside, which meant that the sides of the foundation trenches were crumbling - it cost £20,000 to put right.